国产婷婷,欧美视频免费一区二区三区,日韩中文字幕精品视频在线,国产日韩欧美在线,韩国内涵漫画,天堂网男人,欧美23p

中文

Kunming Konggang Waste-to-Energy Plant Phase II Project Officially Signed


On May 20, the signing ceremony of Kunming Konggang Waste-to-Energy Plant Phase II Project was held at Sanfeng Environment Headquarters. Wei Qian, Deputy Secretary and Director of the Party Working Committee of the Kunming Konggang Economic Zone Management Committee, and the heads of relevant departments, Sanfeng Environment Party Committee Secretary and Director Chairman Lei Qinping, Deputy Secretary of the Party Committee and General Manager Wang Xiaojun, and Deputy General Manager Wang Jiahong attended and witnessed the signing ceremony.

image.png

The design processing capacity of the project is 800 tons/day. It adopts the process of total waste incineration + semi-dry and dry flue gas purification + residual sanitary landfill. It is equipped with a mechanical grate furnace of 800 tons/day and a 20MW medium temperature sub-high pressure steam turbine generator set. The franchise period is 30 years (including a 2-year construction period). Counting the Phase I project of Kunming Konggang Waste-to-Energy Plant that also invested and constructed by Sanfeng Environment (completed and put into operation in 2012) in, the processing scale of the Phase II project will reach 1,800 tons/ day, effectively guaranteeing the “reduction, recycling and harmlessness” treatment of local domestic waste, and fully meeting the needs of urban development.

After the signing ceremony, the two parties had in-depth discussions and exchanges on the project construction and further government-enterprise cooperation. Wei Qian expressed his gratitude and affirmation to Sanfeng Environment, and said that all bureaus of the management committee would fully cooperate to promote the construction of the second phase of the project. He also hoped that with the continuous development of the Konggang Economic Zone, the two sides could cooperate in other projects such as medical waste treatment and further broaden the scope of cooperation between the two parties.

image.png

Before the signing ceremony, Wei Qian and his delegation also visited the manufacturing base and operation control center of Sanfeng Environmental Headquarters, and spoke highly of Sanfeng Environment equipment manufacturing and intelligent management and control.


Address: 3 Jianqiao Avenue, Jianqiao Industrial Park, Dadukou District, Chongqing, China Tel:(+86) 8805 5666

Chongqing Sanfeng Environment Group Corp. Ltd. All Rights Reserved 渝ICP備50010402000216號

黑龙江省| 铁岭县| 宿州市| 普陀区| 北辰区| 定日县| 钟山县| 隆昌县| 蓬溪县| 绿春县| 津南区| 太原市| 循化| 海宁市| 滕州市| 镇赉县| 海林市| 通榆县| 大埔区| 阳朔县| 苍南县| 彩票| 通州区| 博兴县| 镶黄旗| 山西省| 南岸区| 武夷山市| 信阳市| 嘉定区| 金川县| 彭水| 新邵县| 小金县| 马龙县| 鹿泉市| 大连市| 英吉沙县| 金门县| 福海县| 大宁县|